Simplify the Equipment Selection Process

By Tencarva Machinery Co., August 5, 2014

When the pump selection process starts, the required flow of the is often the only known variable for an application. For example, a system must move 2, 000 gallons per minute (gpm) from a holding tank to another tank or process. The size and pressure of the piping and the power of the motor must also be determined.

Image courtesy of pump-zone.com